Skip to content

Integration tests

Integration tests #82

Triggered via schedule January 19, 2024 16:28
Status Failure
Total duration 14m 54s
Artifacts

test-integration.yml

on: schedule
Matrix: tests-windows
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

3 errors
tests (ubuntu-20.04)
Process completed with exit code 2.
tests (macos-11)
The job was canceled because "ubuntu-20_04" failed.
tests (macos-11)
The operation was canceled.