Skip to content

Commit

Permalink
Remove End Year from variable names
Browse files Browse the repository at this point in the history
  • Loading branch information
phackstock committed Apr 5, 2024
1 parent 4b3233a commit 243c406
Show file tree
Hide file tree
Showing 2 changed files with 8 additions and 8 deletions.
4 changes: 2 additions & 2 deletions definitions/variable/energy/energy-services.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -42,6 +42,6 @@
- Energy Service|Transportation|Passenger|{Transport}:
description: Provision of energy services related to passenger {Transport}
unit: Gpkm/yr
- Energy Service|Residential|End Year|Average:
- Energy Service|Residential|Average:
description: Annual electricity consumption per household that is expected to be achieved at the end pf the study.
unit: kWh
unit: kWh
12 changes: 6 additions & 6 deletions definitions/variable/technology/electricity-expansion.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -25,27 +25,27 @@
description: Removed capacity for the electricity network,
this capacity is substracted from the existing capacity
unit: MW
- Network|Electricity|Capacity|Expansion|End Year:
- Network|Electricity|Capacity|Expansion:
description: The additional Capacity required by the expansion of the existing grid
to fully cover the demand at the end of the study.
unit: kW
- Solar PV|Standalone|Capacity|Expansion|End Year:
- Solar PV|Standalone|Capacity|Expansion:
description: The additional Capacity required by the expansion of the standalone Solar PV
to fully cover the demand at the end of the study.
unit: kW
- Solar PV|Mini Grid|Capacity|Expansion|End Year:
- Solar PV|Mini Grid|Capacity|Expansion:
description: The additional Capacity required by the expansion of the PV minigrid
to fully cover the demand at the end of the study.
unit: kW
- Hydro|Mini Grid|Capacity|Expansion|End Year:
- Hydro|Mini Grid|Capacity|Expansion:
description: The additional Capacity required by the expansion of the hydropower mini grid
to fully cover the demand at the end of the study.
unit: kW
- Wind|Mini Grid|Capacity|Expansion|End Year:
- Wind|Mini Grid|Capacity|Expansion:
description: The additional Capacity required by the expansion of the existing wind power mini
to fully cover the demand at the end of the study.
unit: kW
- Network|Electricity|Expansion Cost:
- Network|Electricity|Total Expansion Cost:
description: The investment required by expanding the electric grid to reach the electrification target
at the end of the study.
unit: US$2020
Expand Down

0 comments on commit 243c406

Please sign in to comment.