Skip to content

Update sbt-typelevel, sbt-typelevel-site to 0.5.0-RC5 #574

Update sbt-typelevel, sbt-typelevel-site to 0.5.0-RC5

Update sbt-typelevel, sbt-typelevel-site to 0.5.0-RC5 #574

Triggered via pull request June 30, 2023 00:59
Status Failure
Total duration 1h 12m 13s
Artifacts

ci.yml

on: pull_request
Matrix: Build and Test
Matrix: Submit Dependencies
Matrix: Generate Site
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Build and Test (ubuntu-latest, 2.12, temurin@11, rootJS)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Build and Test (ubuntu-latest, 2.12, temurin@11, rootJS)
The operation was canceled.
Build and Test (ubuntu-latest, 3, temurin@11, rootNative)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Build and Test (ubuntu-latest, 3, temurin@11, rootNative)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12, temurin@11, rootJVM)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 60 minutes.
Build and Test (ubuntu-latest, 2.12, temurin@11, rootJVM)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13, temurin@11, rootJS)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 60 minutes.
Build and Test (ubuntu-latest, 2.13, temurin@11, rootJS)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13, temurin@11, rootJVM)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 60 minutes.
Build and Test (ubuntu-latest, 2.13, temurin@11, rootJVM)
The operation was canceled.
Build and Test (ubuntu-latest, 3, temurin@11, rootJVM)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 60 minutes.
Build and Test (ubuntu-latest, 3, temurin@11, rootJVM)
The operation was canceled.