Skip to content

refactor: upgrade to Camel 4; retrofit RapidPro connectivity in DHIS2… #1415

refactor: upgrade to Camel 4; retrofit RapidPro connectivity in DHIS2…

refactor: upgrade to Camel 4; retrofit RapidPro connectivity in DHIS2… #1415

Triggered via pull request October 4, 2024 14:52
Status Failure
Total duration 46s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (2.39.1.2)
Process completed with exit code 1.
build (2.40.0)
The job was canceled because "_2_39_1_2" failed.
build (2.40.0)
The operation was canceled.
build (2.38.3.1)
The job was canceled because "_2_39_1_2" failed.
build (2.38.3.1)
The operation was canceled.