Skip to content

refactor, clean up #110

refactor, clean up

refactor, clean up #110

Triggered via push October 9, 2024 16:24
Status Cancelled
Total duration 48m 45s
Artifacts 2

ci-build.yaml

on: push
changes
6s
changes
Build & cache Go code
1m 13s
Build & cache Go code
Build, test & lint UI code
1m 34s
Build, test & lint UI code
Ensure Go modules synchronicity
29s
Ensure Go modules synchronicity
Lint Go code
3m 2s
Lint Go code
Check changes to generated code
3m 58s
Check changes to generated code
Matrix: Run end-to-end tests
Run unit tests for Go packages
5m 10s
Run unit tests for Go packages
Run unit tests with -race for Go packages
9m 30s
Run unit tests with -race for Go packages
E2E Tests - Composite result
0s
E2E Tests - Composite result
Process & analyze test artifacts
0s
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

17 errors
Ensure Go modules synchronicity
Process completed with exit code 1.
Lint Go code: hack/get-previous-release/get-previous-version-for-release-notes.go#L69
non-wrapping format verb for fmt.Errorf. Use `%w` to format errors (errorlint)
Lint Go code: hack/get-previous-release/get-previous-version-for-release-notes.go#L120
non-wrapping format verb for fmt.Errorf. Use `%w` to format errors (errorlint)
Lint Go code: hack/get-previous-release/get-previous-version-for-release-notes.go#L111
printf: non-constant format string in call to fmt.Errorf (govet)
Lint Go code: hack/get-previous-release/get-previous-version-for-release-notes_test.go#L89
useless-assert: asserting of the same variable (testifylint)
Lint Go code: hack/get-previous-release/get-previous-version-for-release-notes_test.go#L88
require-error: for error assertions use require (testifylint)
Lint Go code
issues found
Check changes to generated code
Process completed with exit code 1.
Run end-to-end tests (v1.31.0, true)
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/release-notes' exists
Run end-to-end tests (v1.31.0, true)
The operation was canceled.
Run end-to-end tests (v1.29.8, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/release-notes' exists
Run end-to-end tests (v1.29.8, false)
The operation was canceled.
Run end-to-end tests (v1.28.13, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/release-notes' exists
Run end-to-end tests (v1.28.13, false)
The operation was canceled.
Run end-to-end tests (v1.30.4, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/release-notes' exists
Run end-to-end tests (v1.30.4, false)
The operation was canceled.
E2E Tests - Composite result
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
race-results
1.26 MB
test-results
1.25 MB