Skip to content

log stuff

log stuff #90

Triggered via push September 30, 2024 22:56
Status Cancelled
Total duration 10m 59s
Artifacts 1

ci-build.yaml

on: push
changes
5s
changes
Build & cache Go code
3m 10s
Build & cache Go code
Build, test & lint UI code
1m 39s
Build, test & lint UI code
Ensure Go modules synchronicity
24s
Ensure Go modules synchronicity
Lint Go code
4m 34s
Lint Go code
Check changes to generated code
4m 8s
Check changes to generated code
Matrix: Run end-to-end tests
Run unit tests for Go packages
5m 3s
Run unit tests for Go packages
Run unit tests with -race for Go packages
7m 18s
Run unit tests with -race for Go packages
E2E Tests - Composite result
0s
E2E Tests - Composite result
Process & analyze test artifacts
0s
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Run end-to-end tests (v1.30.2, true)
Process completed with exit code 1.
E2E Tests - Composite result
Process completed with exit code 1.
Run unit tests with -race for Go packages
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
Run unit tests with -race for Go packages
The operation was canceled.

Artifacts

Produced during runtime
Name Size
test-results
1.25 MB